Refurbishment: end of December 2006

by Douglas Bridger published Dec 15, 2006 09:36 AM, last modified Jan 11, 2007 04:25 PM

Douglas took some more photos showing off our new facilities.

Image JPEG image New roadside sign by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
The new roadside sign is up for both MSC and Graham's Edgbaston Watersports. The club website even gets a mention!
Image JPEG image Bricked up doorway by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
The old doorway from the changing room to the boat store has been bricked up.
Image JPEG image Disabled Changing Room by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
The entrance space is now bigger and has a new doorway into the disabled changing room.
Image JPEG image Floors and drains by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
All the drains are laid and all the toilet and shower areas have ceramic tiled floors. All walls have been plaster boarded and are ready to be covered in a white plastic cladding. Some of the electrical and plumbing work has been done.
Image JPEG image New front door by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
The new front door is now in.
Image JPEG image Ladies showers and loos by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
Image JPEG image Gent's showers by Douglas Bridger — last modified Jan 11, 2007 04:25 PM
These are now accessed from the changing room.